<< Back To All Office
This project involved the complete refurbishment of the Ground Floor Lobby, Second and Third Floor Lobbies and Toilets and the installation of two new lifts. The project had to be carefully co-ordinated in stages as the building was occupied for the duration of the Refurbishment.
Before
After
Before
After
Before |
After |
|
|
Before |
After |
|
|
Before |
After |
|
|